Internet in Barrie: who has fibre, what the annexed lands lack, and what the City can do
Inside Barrie's pre-2026 limits, almost every home can buy fast wired internet. The land annexed on January 1, 2026 is different: by this site's calculation from federal data, about half of its roughly 140 dwellings have a wired 50/10 Mbps option. Council does not set prices or decide where companies build. What it controls is access to its roads, its land and its permits.
Who provides internet service in Barrie?
In the federal government's National Broadband Data, the wired providers listed for the areas covering Barrie are Bell (fibre to the home and DSL) and Rogers (cable and fibre to the home), with Vianet fibre in 3 of the 13 areas. Fixed wireless is listed from Bell and Rogers and from PTP Broadband, Ultrafast Wireless, Vianet, Xplore, RuralNet and Routcom. Bell, Rogers, Telus and Freedom Mobile run mobile networks. The data is mapped in hexagons of about 25 km² that reach past the city limits, so a listing does not mean a company serves every address.
In September 2022 Bell announced it would bring "all-fibre broadband access to approximately 40,000 additional locations in Barrie by 2025", fully funded by Bell, at speeds up to 3 Gbps. This site found no report from Bell or the City on whether that build was completed.
On September 17, 2026, telMAX, a fibre company headquartered in the Greater Toronto Area, said in a financing announcement that since its 2025 financing round it had been "extending its 100% pure fibre optic network to Markham, Barrie and Oakville". The City's 2026 budget expects Development Services' licence and permit revenue to rise from $736,000 (2025 budget) to $875,000, and gives this reason: "Permit fees have increased due to the Telemax Fibre to the Home project" (the City's spelling). telMAX does not appear among the providers listed for Barrie in the federal data files dated May 2026.
Sources: National Broadband Data: pseudo-household speeds and ISP hexagon tables, with the 2021 Pseudo-Household Demographic Distribution, Innovation, Science and Economic Development Canada (calculated by this site). Original document. Files dated May 2026. This site placed each pseudo-household inside or outside the City's 2026 boundary (City open GIS) and Barrie's 2021 census subdivision (Statistics Canada); annexed lands = inside the first, outside the second. Wired 50/10 Mbps: 99.72% of dwellings in the 2021 city, 74 of about 140 on the annexed lands. Retrieved October 7, 2026. Bell expands pure fibre Internet access to Barrie, Bell Canada (news release), dated September 13, 2022. Original document. Archived copy. Fibre to "approximately 40,000 additional locations in Barrie by 2025", fully funded by Bell, up to 3 Gbps. No completion report was found. Retrieved October 7, 2026. telMAX secures $215 million in growth financing through structured investment from Hamilton Lane and upsized PSIC credit facility, telMAX (PR Newswire, via Finviz), dated September 17, 2026. Original document. States that since its 2025 financing round telMAX has been "extending its 100% pure fibre optic network to Markham, Barrie and Oakville". Original: https://www.prnewswire.com/news-releases/telmax-secures-215-million-in-growth-financing-through-structured-investment-from-hamilton-lane-and-upsized-psic-credit-facility-302882130.html Retrieved October 7, 2026. Service Areas — Tax Rate (2026 Business Plan & Operating Budget), City of Barrie. Original document. Retrieved August 9, 2026.
Can everyone in Barrie get fast internet?
Barrie Springwater Oro-Medonte Ontario, rural
The CRTC counts the share of dwellings where a provider says it offers 50/10 Mbps service with unlimited data. 50/10 Mbps is also the minimum speed the federal Universal Broadband Fund aims to bring to rural households. In Barrie the share was 99.2% in 2016 and 100.0% in 2024 and 2025. The two townships that held the annexed land until 2026 started far lower: Springwater at 48.6% and Oro-Medonte at 48.9% in 2016. By 2025 they had reached 99.1% and 97.1%. Rural Ontario as a whole reached 82.6%. Gigabit service is less complete outside the city: in 2025 it was available to 99.2% of Barrie dwellings, 75.3% in Springwater and 69.8% in Oro-Medonte.
Some of the township fibre was built with public money. A federal Universal Broadband Fund agreement with Rogers, worth $22,070,836 and running from January 2022 to December 2025, covers fibre to 20,544 households in 83 communities in Springwater, Oro-Medonte and seven other municipalities. In August 2021 the SWIFT program, which has federal and provincial funding, reported that Bell had started fibre construction in both townships.
Sources: Communications Market Reports open data: broadband and mobile service availability by census subdivision and year (Table 9), 2016–2025, Canadian Radio-television and Telecommunications Commission (summed by this site). Original document. Shares of dwellings with 50/10 Mbps unlimited and gigabit service available, summed by this site across each census subdivision's population-centre rows. ISP-reported availability; the CRTC notes it "may not take into account capacity issues or issues regarding line of sight". Grants and contributions disclosure: Universal Broadband Fund agreement 817658, Rogers Communications Canada Inc., Innovation, Science and Economic Development Canada (Open Government grants search). Original document. $22,070,836, January 15, 2022 to December 31, 2025: fibre to 20,544 households in 83 communities in Springwater, Oro Medonte, Essa, New Tecumseth, Mono, Adjala, Caledon, Erin and Uxbridge. SWIFT announces major construction now underway to expand high-speed internet access in Simcoe County, SWIFT (South West Integrated Fibre Technology), dated August 9, 2021. Original document. Bell broke ground on SWIFT-funded fibre projects including parts of Springwater and Oro-Medonte. All retrieved October 7, 2026.
What about the annexed lands?
The CRTC's figures are for whole municipalities, so this site estimated the annexed lands separately. Method: we took every federal pseudo-household point (the government's model of where dwellings sit, weighted by the 2021 Census) inside the City's 2026 boundary but outside Barrie's 2021 census boundary, and read each point's service flags from ISED's National Broadband Data.
| Area | Dwellings (2021 Census) | Wired line (DSL, cable, fibre) | Wired or fixed wireless |
|---|---|---|---|
| Barrie before 2026 (2021 census subdivision) | 57,276 | 99.72% | 99.99% |
| Annexed lands (in the 2026 boundary, outside the 2021 one) | 140 | 53.18% | 100.00% |
| Barrie today (2026 City boundary) | 57,385 | 99.61% | 99.99% |
On the annexed lands, 74 of about 140 dwellings (377 people in 2021) have a wired 50/10 option. For 43 of them the best wired option is below 5/1 Mbps, and 13 have no wired service recorded. According to the data, every dwelling there has 50/10 available from a fixed-wireless provider. The CRTC cautions that availability data "may not take into account capacity issues or issues regarding line of sight". The counts are small and on the 2021 basis, before any new building, and the City's and Statistics Canada's boundary lines do not match exactly at the edges, so treat them as estimates.
Sources: National Broadband Data: pseudo-household speeds and ISP hexagon tables, with the 2021 Pseudo-Household Demographic Distribution, Innovation, Science and Economic Development Canada (calculated by this site). Original document. Files dated May 2026. This site placed each pseudo-household inside or outside the City's 2026 boundary (City open GIS) and Barrie's 2021 census subdivision (Statistics Canada); annexed lands = inside the first, outside the second. Wired 50/10 Mbps: 99.72% of dwellings in the 2021 city, 74 of about 140 on the annexed lands. National Broadband Data Information, Innovation, Science and Economic Development Canada, dated July 31, 2026. Original document. Methodology: an inventory of publicly advertised service areas reported by facilities-based ISPs, on a pseudo-household model of the 2021 Census; wireline means DSL, cable or fibre to the home, wireless means fixed wireless. Communications Market Reports open data: broadband and mobile service availability by census subdivision and year (Table 9), 2016–2025, Canadian Radio-television and Telecommunications Commission (summed by this site). Original document. Shares of dwellings with 50/10 Mbps unlimited and gigabit service available, summed by this site across each census subdivision's population-centre rows. ISP-reported availability; the CRTC notes it "may not take into account capacity issues or issues regarding line of sight". All retrieved October 7, 2026.
What does internet cost?
The CRTC does not publish prices for Barrie. For urban Ontario, its average price for a 50/10 Mbps plan was $70.86 a month in 2016, fell to $59.55 in 2019, peaked at $79.30 in 2023 and was $74.87 in 2025.
Source: Year-end monthly reported prices for Internet, mobile and TV services (version 11), Canadian Radio-television and Telecommunications Commission, dated May 14, 2026. Original document. Ontario urban average for a 50/10 Mbps plan: lowest non-promotional prices reported as of December 31, fees and discounts excluded. Barrie is not in the sample; by this site's count the 2024 and 2025 Ontario urban price rows name Toronto only (eight cities before). Retrieved October 7, 2026.
What can the City do about internet service?
Roads. Under the federal Telecommunications Act, no carrier may build a line on, over, under or along a highway or other public place "without the consent of the municipality". If a carrier cannot get consent on terms acceptable to it, it can ask the CRTC, which may grant permission with conditions of its own. Ontario's Building Broadband Faster Act, 2021, as amended in 2022, adds a deadline: for a broadband project the Province has designated, a municipality must issue its consent or permit, or identify a problem with the application, within 10 business days (15 if more than 30 km of municipal road or land is involved).
| Fee | 2025 approved | 2026 proposed |
|---|---|---|
| Municipal consent application | $117.63 | $123.27 |
| Right-of-way permit for municipal consents / utilities | $422.51 | $442.79 |
| Review of a telecommunication facility application | $3,897.30 | $4,084.37 |
| Review of a small-cell installation (per structure) | $117.40 | $123.04 |
Sources: Telecommunications Act, S.C. 1993, c. 38, section 43, Department of Justice Canada — Justice Laws. Original document. s. 43(3): no carrier shall build a transmission line on a highway or other public place "without the consent of the municipality"; s. 43(4): failing consent on acceptable terms, the CRTC may grant permission. Retrieved October 7, 2026. Building Broadband Faster Act, 2021, S.O. 2021, c. 2, Sched. 1, Government of Ontario — e-Laws. Original document. Consolidated from April 1, 2026. s. 10.1 (added 2022): a municipality must act on a designated broadband project's right-of-way application within 10 business days, or 15 where more than 30 km is involved. Retrieved October 7, 2026. 2026 Proposed Fee Changes (2026 Business Plan & Operating Budget), City of Barrie. Original document. 2025 approved and 2026 proposed fees. Telecommunication facility review $3,897.30 to $4,084.37; small cell $117.40 to $123.04 per structure; municipal consent application $117.63 to $123.27; right-of-way permit for municipal consents/utility $422.51 to $442.79. Retrieved August 9, 2026.
Towers and antennas. Under the City's 2012 protocol for telecommunication facilities, approval rests with the federal government ("Industry Canada as approval authority", in the protocol's words). The City reviews each proposal and issues a letter of concurrence or tells the federal department it does not concur. In 2018 Council approved a Commercial Cell Towers / Antennas on City Owned Property Policy (motion 18-G-195, General Committee on September 24, adopted by Council on October 1), and gave staff authority to sign master agreements with "Third Party communications companies" for equipment on City land.
Sources: Protocol for Consideration of Telecommunication Facilities Applications, City of Barrie, dated August 27, 2012. Original document. Adopted by Council August 27, 2012. Industry Canada is the approval authority; the City issues a Municipal Letter of Concurrence or advises non-concurrence. Retrieved October 7, 2026. General Committee Minutes, September 24, 2018, City of Barrie — General Committee, dated September 24, 2018. Original document. 18-G-195, telecommunication facilities on City-owned property: approves the Commercial Cell Towers / Antennas on City Owned Property Policy (PLN027-18) and authority for master agreements with third-party communications companies. Retrieved August 9, 2026. City Council Minutes, October 1, 2018, City of Barrie — City Council, dated October 1, 2018. Original document. Adopts 18-G-195 (Section "B" of the September 24, 2018 General Committee report). Retrieved August 9, 2026.
What has council done about internet access?
In October 2013 General Committee asked staff in the Innovate Barrie division to work with the BIA "to investigate the feasibility of providing free WiFi service and expanding the fibre optic network in the downtown corridor by summer, 2014" (13-G-258, adopted by Council on November 4, 2013). In May 2016 Council heard a presentation on SWIFT, a regional fibre project, whose topics included "How the SWIFT Project will provide opportunity for improved broadband access in Barrie"; the presenter urged Council to press the federal government for a fibre/broadband strategy. In September 2019 General Committee asked staff to "investigate opportunities for the City of Barrie to become a Smart City and report back to the City Building Committee" (19-G-244, adopted by Council on September 16, 2019).
This site found no report back on either the 2013 or the 2019 request in the council and committee minutes it has collected, which run from 2013 to September 2026. It also found no source for a City-owned fibre network for public use, a "dig once" policy, or a City broadband strategy. What the 2026 budget does fund is the City's own corporate network: project IT1066 renews switches, firewalls and Wi-Fi access points "across the City's facilities and data centres".
Sources: General Committee Minutes, October 24, 2013, City of Barrie — General Committee, dated October 24, 2013. Original document. 13-G-258, WiFi service in the downtown corridor: Innovate Barrie staff and the BIA to investigate free WiFi and expanding the fibre optic network downtown "by summer, 2014". City Council Minutes, November 4, 2013, City of Barrie — City Council, dated November 4, 2013. Original document. Adopts 13-G-258 (Section "B" of the October 24, 2013 General Committee report). City Council Minutes, May 9, 2016, City of Barrie — City Council, dated May 9, 2016. Original document. 16-A-057, presentation on the South West Integrated Fibre Technology (SWIFT) project. General Committee Minutes, September 9, 2019, City of Barrie — General Committee, dated September 9, 2019. Original document. 19-G-244, Smart City opportunities: Invest Barrie and Innovate Barrie staff to investigate and report back to the City Building Committee. City Council Minutes, September 16, 2019, City of Barrie — City Council, dated September 16, 2019. Original document. Adopts 19-G-244 (Section "A" of the September 9, 2019 General Committee report). 2026 Capital Project Detail Report, City of Barrie. Original document. 241 pages, one detail sheet per project with project numbers. All retrieved August 9, 2026.
What can council actually decide?
- Council decides: the terms of consent for lines in City roads, within the provincial deadlines; the fees for municipal consents, road permits and tower reviews; whether to lease City land for towers and antennas, under the 2018 policy; whether to study or build any public Wi-Fi or fibre of its own; the City's own corporate network.
- Council does not decide: internet prices (set by the companies) or the rules for the industry (federal law and the CRTC); whether a tower is approved (the federal government, after the City's review); where companies build (the companies, sometimes with federal or provincial subsidies); or a dispute over road consent, which a carrier can take to the CRTC.
What the candidates have said
Verbatim, attributed, dated. Every passage below is copied exactly from an archived copy of its source — a campaign website, a news article, or the candidate's own social media post — and links to it. Nothing is paraphrased by this site and no for-or-against label is applied: read the words, follow the link. Passages from news coverage say whether they are the candidate quoted, the reporter's reported speech, or the reporter's characterisation.
Compiled in a research batch dated September 11, 2026, reviewed by hand before publication on October 8, 2026. Passages are capped at 60 words and listed newest first. Campaign pages are undated, so only the retrieval date is shown for them, and they sort by it. A candidate with nothing located on an issue is listed as such, with the date their sources were checked; a race is shown only once every candidate in it has been checked. See methodology.
Mayor
Kay Sayer
-
We paid for towers, fibre, hydro corridors. We should not pay a trillionaire to rent back our own eyes. Community-owned fibre, micro-grids on arenas, open budget dashboard.
Source: As quoted in barrietoday.com, Sayer's top concerns include daylight saving time, free speech, October 1, 2026 (paragraph 10, sentences 2–4). Read October 7, 2026. news
No published statement on this issue located for 3 candidates. Campaign website read, nothing located on this issue (October 7, 2026): Alex Nuttall, Tanya Saari. No campaign website on the City's list: Russell Tighe. Indexed news coverage checked October 7, 2026: none quoting any of them on this issue. Social media posts not yet checked.
Ward 1
No published statement on this issue located for 6 candidates. Campaign website did not answer when checked (October 7, 2026): Stefano Agostino. Campaign website read, nothing located on this issue (October 7, 2026): Shaughna Ainsworth, Brent Bowser, Hafiz Rahman, Pauline Stevenson. No campaign website on the City's list: Christian Cadera. Indexed news coverage checked October 7, 2026: none quoting any of them on this issue. Social media posts not yet checked.
Ward 2
No published statement on this issue located for 5 candidates. Campaign website read, nothing located on this issue (October 7, 2026): Frank Casera, Shanicka Edwards, Craig Nixon, Ajmal Noushahi. No campaign website on the City's list: Tracy Strohm. Indexed news coverage checked October 7, 2026: none quoting any of them on this issue. Social media posts not yet checked.
Ward 3
No published statement on this issue located for 4 candidates. Campaign website read, nothing located on this issue (October 7, 2026): Amy Courser, Ben Hughes, Ryan Rijo. No campaign website on the City's list: Bryan Jones. Indexed news coverage checked October 7, 2026: none quoting any of them on this issue. Social media posts not yet checked.
Ward 4
No published statement on this issue located for 5 candidates. Campaign website read, nothing located on this issue (October 7, 2026): Iradat Ahmad, Lori Galeazza, Arif Khan. No campaign website on the City's list: Matthew Corbett, Patrick Harriott-Stewart. Indexed news coverage checked October 7, 2026: none quoting any of them on this issue. Social media posts not yet checked.
Ward 5
No published statement on this issue located for 2 candidates. Campaign website read, nothing located on this issue (October 7, 2026): Duarte Da Silva, Robert Thomson. Indexed news coverage checked October 7, 2026: none quoting any of them on this issue. Social media posts not yet checked.
Ward 6
No published statement on this issue located for 3 candidates. No campaign website on the City's list: Nasar George Nader. Campaign website read, nothing located on this issue (October 7, 2026): Nigussie Nigussie, Christel Pena. Indexed news coverage checked October 7, 2026: none quoting any of them on this issue. Social media posts not yet checked.
Ward 7
No published statement on this issue located for 2 candidates. Campaign website read, nothing located on this issue (October 7, 2026): Gary Harvey. No campaign website on the City's list: Michael Lewis. Indexed news coverage checked October 7, 2026: none quoting any of them on this issue. Social media posts not yet checked.
Ward 8
No published statement on this issue located for 3 candidates. Campaign website read, nothing located on this issue (October 7, 2026): Samina Alim, Jim Harris, Amanda Fellows. Indexed news coverage checked October 7, 2026: none quoting any of them on this issue. Social media posts not yet checked.
Ward 9
No published statement on this issue located for 4 candidates. Campaign website read, nothing located on this issue (October 7, 2026): Norm Costello, Sergio Morales, Asmar Naveed, Dave Weingarten. Indexed news coverage checked October 7, 2026: none quoting any of them on this issue. Social media posts not yet checked.
Ward 10
No published statement on this issue located for 3 candidates. No campaign website on the City's list: William Cadeau. Campaign website read, nothing located on this issue (October 7, 2026): Bryn Hamilton, Georgy Kapustin. Indexed news coverage checked October 7, 2026: none quoting any of them on this issue. Social media posts not yet checked.
School board trustees
None of the 19 trustee candidates across 7 races has a located statement on this issue; trustees do not decide it. Their statements are on the education page, and each candidate's own page says what was checked.
Common questions
Can the City of Barrie lower internet prices?
No. Internet companies set their own prices, and telecommunications is regulated federally, under the Telecommunications Act and by the CRTC. The City's role is consent to use its roads and rights-of-way, permits and fees for that work, and leases for equipment on City land.
Is fast internet available on the land Barrie annexed in 2026?
Partly. By this site's calculation from federal broadband data, about 53% of the roughly 140 dwellings there (2021 Census count) can get 50/10 Mbps service over a wired line. Counting fixed wireless, all of them can. Inside the pre-2026 city, wired 50/10 service reaches 99.7% of dwellings.
Does the City of Barrie own a fibre network?
This site found no source describing a City-owned fibre network for public use, and no "dig once" policy. The City's budget does fund network equipment for its own facilities.